Project Status Report

A module to capture the status report for each project that is now active. Each active project should have a weekly status report. The format of the text of the status report is open. However, a status report will include the following: REQUIRED fields:

  • Project Name picked from list of charters

     

  • Project Status picked from radio button group of 3 choices Red, Yellow, or Green (default Green)

     

  • Period Ending The last day of the period covered by the status report

     

  • Brief Description Tittle for the status report

     

  • Status single large text field for status

     